Case study · EnergyWorked example · not a named-client scorecard
Energy · EMEA · 38 substations

Contractor and lone-worker safety across 38 substations.

A European transmission operator needed worker safety and contractor control across 38 substations during outages.

___BLOCK14___CASE STUDYSubstation safetyEnergy · EMEA · 38 substationsUWBlive position · UWB38SubstationsLone-workerSOS coverageGeofencedHV zones

Case studies and programme figures on this page are composite worked examples — patterns from comparable deployments, not attributed results for a named client. Named references are available under NDA when you engage.

Request a named reference under NDA

The challenge

What they were up against.

Lone workers invisible

Technicians at remote substations had no reliable way to raise an alarm.

Clipboard contractor control

Outage contractor control was a manual, paper exercise.

HV clearance by procedure

Keeping people clear of energised equipment relied on procedure, not interlocks.

Composite worked example — figures are ranges from comparable programmes, not attributed named-client results. Named references available under NDA. We model your own numbers when you engage.

Our approach

Vendor-neutral, tied to a named KPI.

We delivered contractor and lone-worker tracking with geofenced high-voltage safety zones during outages, across 38 substations.

How we solved it

What we delivered.

  • Lone-worker SOS and man-down detection
  • Geofenced high-voltage exclusion zones
  • Contractor on-site register with exit reconciliation
Results

The typical range for a programme of this shape.

38
Substations
Lone-worker
SOS coverage
Geofenced
HV zones
Outage
Workforce visibility
Technology used

The stack behind it

UWB / BLEGPSMaximo / GIS
How we measured it

Baseline, method, period — and what we excluded.

These pages are composite worked examples, not named-client scorecards. Figures are ranges from comparable RTLS/RFID programmes and published industry sources where noted.

  • Baseline: Contractor control via paper permits; lone-worker response ad hoc.
  • Method: Geofenced HV exclusion reading permit state; lone-worker duress; time-to-verified muster on outage work.
  • Period: Substation cohort across planned outages.
  • Excluded: Generation-plant anecdotes pasted onto TSO/DNO sites without permit join.

Programme pattern for this vertical

TSO/DNO programmes focus on contractor control, inductive hazard zones, and emergency accountability across many small sites. Tags and processes must work for infrequent visitors, not only employees.

Central security operations need exception queues; local site leads need simple devices and clear SOPs.

Outcomes to expect — and how they are earned

Outcomes: improved visitor compliance, faster incident location, better evidence for regulators and insurers. Multi-site rollout governance matters more than any single pilot dashboard.

Lessons from comparable programmes

Lessons: do not copy office badge RTLS; join permits; budget for device logistics across dozens of substations.

Deeper problem framing

Dozens of substations, infrequent visitors, inductive hazards, and principal-contractor duties create a control problem that a single-site RTLS demo never reveals.

Approach

Standard kit + central exception queue; permit join; device logistics model; multi-site rollout playbook; privacy-minimised zone events.

Outcomes and measurement

Visitor compliance, incident locate time, contractor scorecards. Governance across sites beats any single dashboard.

Governance, risk and what we refuse to claim

These pages remain composite worked examples — not named-client results. We will not attribute percentages to a confidential site. When you engage, we rebuild baselines from your incidents, labour samples and system logs.

We refuse vanity accuracy claims without a coverage map, and we refuse programmes that silently add productivity surveillance onto a safety business case without a fresh DPIA or labour consultation.

Implementation sequence and change management

Design the multi-site operating model before RF: central SOC queue, local device kits, induction workflow, permit join. Pilot 3–5 representative substations (urban, rural, indoor GIS).

KPIs: visitor compliance, time-to-locate on drill, kit loss rate. Expand only when logistics works. Public/regulatory evidence packs should be reproducible, not screenshot-based.

Reject commercial office badge analogies in the RFP response scoring.

Buyer checklist, vendor challenges and engagement shape

For multi-substation estates, evaluate device logistics and central exception queues as carefully as radio choice.

Buyer checklist before you sign: (1) written system of record for events; (2) acceptance tests with 95th-percentile performance under real interference; (3) integration owner named in IT/OT; (4) privacy or labour consultation path if people are tagged; (5) cybersecurity zoning sketch; (6) five-year TCO including batteries, spares, recalibration and SLA escalations; (7) exit/export terms so you are not hostage to a cloud tenant; (8) a pilot that can fail without political punishment.

Vendor claims to challenge in this pattern: brochure accuracy without production load; 'compliance included' without artefacts; ROI that assumes perfect adoption in 30 days; references that cannot be called under NDA; install partners who have never worked your vertical's overlays; shared support accounts; and any design that dumps locating onto a flat plant or clinical VLAN.

How TRACIO typically engages: stage-1 architecture and measurement design; vendor-neutral shortlist and RFP language; pilot acceptance criteria; then optional implementation oversight or programme rescue if a prior pilot stalled. We stay independent of hardware margin. Composite pages like this one exist so you can prepare the workshop — your numbers replace every planning band when we model payback.

Risk register themes that recur: mute fatigue on alerts; shadow spreadsheets reappearing beside the platform; battery logistics understaffed; master data too weak to support identity; works-council or IG review starting too late; and success declared on demo day before night-shift reality.

Document baseline windows explicitly: what you measured, for how long, which shifts, and what you excluded. Investment committees and auditors both punish fuzzy before/after stories. If your baseline is weak, spend two to four weeks fixing measurement before ordering anchors or portals. That discipline is cheaper than a stranded deployment and is the difference between a locating programme and a technology souvenir.

Programme pattern for this vertical

TSO/DNO programmes focus on contractor control, inductive hazard zones, and emergency accountability across many small sites. Tags and processes must work for infrequent visitors, not only employees.

Central security operations need exception queues; local site leads need simple devices and clear SOPs.

Governance, risk and what we refuse to claim

These pages remain composite worked examples — not named-client results. We will not attribute percentages to a confidential site. When you engage, we rebuild baselines from your incidents, labour samples and system logs.

We refuse vanity accuracy claims without a coverage map, and we refuse programmes that silently add productivity surveillance onto a safety business case without a fresh DPIA or labour consultation.

Implementation sequence and change management

Design the multi-site operating model before RF: central SOC queue, local device kits, induction workflow, permit join. Pilot 3–5 representative substations (urban, rural, indoor GIS).

KPIs: visitor compliance, time-to-locate on drill, kit loss rate. Expand only when logistics works. Public/regulatory evidence packs should be reproducible, not screenshot-based.

Reject commercial office badge analogies in the RFP response scoring.

Buyer checklist, vendor challenges and engagement shape

For multi-substation estates, evaluate device logistics and central exception queues as carefully as radio choice.

Buyer checklist before you sign: (1) written system of record for events; (2) acceptance tests with 95th-percentile performance under real interference; (3) integration owner named in IT/OT; (4) privacy or labour consultation path if people are tagged; (5) cybersecurity zoning sketch; (6) five-year TCO including batteries, spares, recalibration and SLA escalations; (7) exit/export terms so you are not hostage to a cloud tenant; (8) a pilot that can fail without political punishment.

Vendor claims to challenge in this pattern: brochure accuracy without production load; 'compliance included' without artefacts; ROI that assumes perfect adoption in 30 days; references that cannot be called under NDA; install partners who have never worked your vertical's overlays; shared support accounts; and any design that dumps locating onto a flat plant or clinical VLAN.

How TRACIO typically engages: stage-1 architecture and measurement design; vendor-neutral shortlist and RFP language; pilot acceptance criteria; then optional implementation oversight or programme rescue if a prior pilot stalled. We stay independent of hardware margin. Composite pages like this one exist so you can prepare the workshop — your numbers replace every planning band when we model payback.

Risk register themes that recur: mute fatigue on alerts; shadow spreadsheets reappearing beside the platform; battery logistics understaffed; master data too weak to support identity; works-council or IG review starting too late; and success declared on demo day before night-shift reality.

Document baseline windows explicitly: what you measured, for how long, which shifts, and what you excluded. Investment committees and auditors both punish fuzzy before/after stories. If your baseline is weak, spend two to four weeks fixing measurement before ordering anchors or portals. That discipline is cheaper than a stranded deployment and is the difference between a locating programme and a technology souvenir.

Could this be your programme?

Tell us where you are stuck.

Thirty minutes on your use case, the numbers, and what would actually move your KPIs. Vendor-neutral, no platform pitch.

预约 30 分钟范围沟通Get the vendor selection checklistDownload the buyer’s guide

Last updated:

How TRACIO worked the problem

Network safety and access

Independent advisory means the radio is chosen last — after the job, the constraints and the system of record are clear.

Permit and substation reality

People accountability and asset jobs scoped to live network rules.

OT-aware shortlists

Independence matters when OEMs push their own locating stack.

Design to the control room

Events for the operators who already own the alarm philosophy.

Measurement

Baseline: lone-worker check-in gaps, permit-to-work exceptions, and time-to-muster. Pilot: one site or substation with RTLS/wearables tied to the EHS workflow. Steady-state: check-in compliance, muster time, and open permit exceptions. Safety claims stay within what the site’s EHS lead will sign.