Wat het programma heeft geleverd.
UWB positionele nauwkeurigheid voor analytics.
Snelheid, afstand en belasting per atleet.
Werklastmanagement ter ondersteuning van blessurepreventie.
Composite worked example — figures are ranges from comparable programmes, not attributed named-client results. Named references available under NDA. We model your own numbers when you engage.
De uitdaging
Draagbare data mist de ruimtelijke context; Handmatige analyse is traag. Coaches willen betrouwbare, realtime statistieken waarop ze kunnen handelen.
Onze aanpak
- UWB ankert rond het veld / het veld voor sub-meter positiegegevens.
- Atleettags die snelheid, afstand, acceleratie en belasting vastleggen.
- Realtime dashboards voor coaching en medisch personeel.
- Laaddrempels en alerts voor workloadbeheer.
- Integreer met prestatie- en analyseplatforms.
Technologie & integratie
Stack ingezet: UWB RTLS anchors + atleettags, high-rate positionering, analyticsplatform.
Integratie: Prestatie-analyse, medische / lastmanagementsystemen, video.
Gerelateerd: · Spelersanalyse · UWB vs BLE
Governance, risico en wat we weigeren te claimen
Composite example only. Your payback depends on adoption, integration quality and exception labour — not tag unit cost. Named references under NDA on engagement.
We challenge any vendor who asks you to accept demo-day averages as production truth.
Koperschecklist, leveranciersuitdagingen en engagementvorm
For athlete load, fund multi-year medical integration and consent operations beyond the first season.
Buyer checklist before you sign: (1) written system of record for events; (2) acceptance tests with 95th-percentile performance under real interference; (3) integration owner named in IT/OT; (4) privacy or labour consultation path if people are tagged; (5) cybersecurity zoning sketch; (6) five-year TCO including batteries, spares, recalibration and SLA escalations; (7) exit/export terms so you are not hostage to a cloud tenant; (8) a pilot that can fail without political punishment.
Vendor claims to challenge in this pattern: brochure accuracy without production load; 'compliance included' without artefacts; ROI that assumes perfect adoption in 30 days; references that cannot be called under NDA; install partners who have never worked your vertical's overlays; shared support accounts; and any design that dumps locating onto a flat plant or clinical VLAN.
How TRACIO typically engages: stage-1 architecture and measurement design; leveranciersneutraal shortlist and RFP language; pilot acceptance criteria; then optional implementation oversight or programme rescue if a prior pilot stalled. We stay independent of hardware margin. Composite pages like this one exist so you can prepare the workshop — your numbers replace every planning band when we model payback.
Risk register themes that recur: mute fatigue on alerts; shadow spreadsheets reappearing beside the platform; battery logistics understaffed; master data too weak to support identity; works-council or IG review starting too late; and success declared on demo day before night-shift reality.
Document baseline windows explicitly: what you measured, for how long, which shifts, and what you excluded. Investment committees and auditors both punish fuzzy before/after stories. If your baseline is weak, spend two to four weeks fixing measurement before ordering anchors or portals. That discipline is cheaper than a stranded deployment and is the difference between a locating programme and a technology souvenir.
Training and communications plan: who explains purpose to operators, how often refreshers run, how contractors are inducted, and how successes are fed back without turning safety systems into league tables. Budget a champion network on each shift. Platforms do not adopt themselves. Where unions or works councils exist, share the purpose statement and retention rules early — surprise monitoring is how programmes die. Finally, schedule a formal gate review against the written criteria; celebrate a no-go if evidence is weak. Expanding failure is not delivery.
Laatst bijgewerkt: