Energy & UtilitiesAnonymised case study — client identity confidential.
Energy & Utilities · Case study

Right people, right zone, accounted for — with a duress button that knows where you are.

An energy or utilities operator needs to enforce permit-to-work zones at live substations and protect lone workers in remote or hazardous areas.

Permit-to-work zone scene
Outcomes

What the programme delivered.

100%

Permit-to-work zone compliance, logged.

Located

Lone-worker duress with position for response.

Audit-ready

Contractor / visitor accountability on site.

Client identity withheld under confidentiality. Figures reflect outcomes from comparable RTLS/RFID deployments; your own numbers depend on use case, environment and execution.

The challenge

Unauthorised zone entry around live equipment is a safety event; lone workers in remote sites can’t be located quickly if something goes wrong.

Our approach

  • Geofenced permit-to-work zones with access verification.
  • Lone-worker tags with duress and man-down detection.
  • Real-time location for emergency response.
  • Contractor and visitor accountability on site.
  • Integrate with EHS, access control and dispatch.

Technology & integration

Stack deployed: UWB / BLE zones, LoRaWAN for wide-area sites, ruggedised wearables.

Integration: EHS, access control, dispatch / SCADA.

Related: Energy & utilities RTLS · Substation safety · Vendor checklist

Same problem on your floor?

Let’s scope the real numbers for your operation.