
RTLS & RFID supplier selection, on your side of the table
We reply within one working day with questions or a written price. No obligation. Fixed-scope engagements from £3k. Prefer to talk? Book a free 30-minute call.
Not ready for a call? ··
Independent supplier selection and RFP support for RTLS and RFID: requirements, shortlist, RFP, scoring, TCO, reference calls, proof-of-concept design and contract review. Advice first. We also supply, lease and integrate if you choose.
Delivered by our team. Fees agreed in writing after scoping, typically 3 to 6 weeks.
Prefer to talk? Book a free 30-minute call.
Why RTLS and RFID selections go wrong.
Demo-day accuracy
Suppliers show accuracy and read rates from a clean demo room. Your metal racking, density and people are not in the demo.
Requirements written by the seller
When the only technical specialist in the room sells one technology, the requirements quietly fit that technology.
Price without the whole cost
Tags and anchors are rarely the biggest line. Integration, batteries, support, recalibration and change management decide the five-year cost.
Read what RTLS costs over five years before you compare quotes.
What supplier selection covers.
Requirements & use cases
Workshops with operations, IT/OT, procurement and safety. Use cases, accuracy and latency needs, systems of record, constraints and what success means.
Long-list to short-list
A market scan across technologies and suppliers, narrowed to a short-list with the reasons written down, including why others were dropped.
RFP pack
Built from our RFP template: requirements, integration and security questions, acceptance criteria and pricing schedules that can be compared line by line.
Scoring
Weighted scoring in the supplier matrix, agreed with you before responses arrive, so the scores are not reverse-engineered.
Five-year TCO
Hardware, licences, integration, network, batteries, spares, support and internal effort in the TCO model, per short-listed supplier.
Reference calls
Structured calls with supplier references running a similar environment, with questions on what failed, not only what worked.
PoC or bake-off design
Where needed, a scripted test on your site with written pass/fail criteria, measured under real interference and load.
Contract & SLA review
SLA, support escalation, data ownership and export, exit terms and price protection, reviewed before you sign.
Deliverables
| Deliverable | Why it matters |
|---|---|
| Requirements specification & use-case catalogue | One agreed statement of need that every supplier answers against |
| Short-list rationale | A written record of why each supplier is in or out, for procurement and audit |
| RFP pack | Comparable responses instead of brochures |
| Scored supplier matrix | Weighted, evidence-based scores agreed in advance |
| Five-year TCO per short-listed supplier | The whole cost, not the tag price |
| Reference-call notes | What comparable sites say when the supplier is not on the call |
| PoC / bake-off test plan (where needed) | Pass/fail criteria written before anyone sees results |
| Contract & SLA review notes | Negotiation points on support, data ownership and exit |
| Recommendation report | A board-ready summary with the evidence behind it |
Engagement shape, duration and fee
Supplier selection and RFP support typically runs for 3 to 6 weeks; a pilot that follows has its timing agreed per site. Every engagement is scoped per project and priced in writing before work starts: £3k to £30k per project, or £1,200 a day. Regional ranges for Europe, North America and other regions are on how we work. Fees exclude hardware, licences, third-party costs and travel.
Supplier selection and RFP support typically runs for 3 to 6 weeks; a pilot that follows has its timing agreed per site. Every engagement is scoped per project and priced in writing before work starts: £3k to £30k per project, or £1,200 a day. Regional ranges for Europe, North America and other regions are on how we work. Fees exclude hardware, licences, third-party costs and travel.
Indicative ranges from How we work & fees. Fees are confirmed in writing after scoping, and exclude hardware, software licences, third-party costs and travel & expenses. You can stop at any gate and keep the artefacts from that stage.
What we need from you
- A named sponsor who can make the decision, and an owner for the system of record the locating data will feed.
- Two or three hours each from operations, IT/OT, procurement and health & safety for the requirements workshops. Include your DPO if people will be tracked.
- Floor plans or CAD drawings, and a list of the systems the data should feed (for example WMS, MES, ERP, CMMS).
- Site access for a walkthrough and, where the environment is uncertain, an RF survey.
- Your procurement rules, contract templates and any budget envelope, so the RFP fits how you actually buy.
Independence
- "We work for you, not for the technology providers."
- You can buy direct from the supplier you choose, on your own paper, or have us supply it as a separate, optional service.
- We say "do not buy yet" when the evidence is not there.
How this holds in practice is set out in our independence policy. For when to use an independent specialist rather than an integrator, see RTLS specialist vs integrator.
Proof and further reading
Our case studies describe engagements our specialists led in earlier roles. Client names are withheld under NDA. Read the case studies. To prepare before a call, work through the RTLS supplier selection checklist and the pilot success criteria guide.
Frequently asked questions
What does an RTLS or RFID supplier selection engagement include?
Requirements and use cases, a long-list and a reasoned short-list, an RFP pack, weighted scoring, a five-year TCO, reference calls, a proof-of-concept or bake-off design where one is needed, and a review of the contract and SLA before you sign. You finish with a written recommendation you can take to your board.
How long does supplier selection take, and what does it cost?
Supplier selection and RFP support typically runs for 3 to 6 weeks; a pilot that follows has its timing agreed per site. Every engagement is scoped per project and priced in writing before work starts: £3k to £30k per project, or £1,200 a day. Regional ranges for Europe, North America and other regions are on how we work. Fees exclude hardware, licences, third-party costs and travel.
Do you sell or resell hardware?
Only if you choose. Supply is optional and on a separate contract from our advice. You can also buy direct from the supplier, on your own paper. See our independence policy.
Can we use your templates without hiring you?
Yes. The RFP template, supplier scoring matrix and TCO model are free to use. The engagement adds the judgement: which requirements matter for your site, how to weight them, and how to test supplier claims.
Do we need a proof of concept or bake-off?
Not always. We recommend one when accuracy, read rates or battery life in your environment are uncertain, or when two suppliers score too close to call. We script it on your floor with written pass/fail criteria, so it tests production conditions rather than a demo.
What happens if no supplier meets our requirements?
We say so. The options are usually to rescope, phase the requirements, or not proceed yet. You keep the requirements, shortlist, scoring and TCO whatever you decide.
Do you negotiate the contract for us?
We review the contract, SLA, support terms, data ownership and exit terms, and give you the points to negotiate. You contract directly with the supplier, or have us supply on a separate contract if you prefer.
Which technologies and suppliers do you cover?
RTLS (UWB, BLE, Wi-Fi and hybrid), passive RAIN RFID, active RFID, and GNSS or LoRaWAN for outdoor assets. We assess suppliers on your requirements rather than a preferred list; see our supplier profiles.
Talk it through in 30 minutes
Free, with no obligation. After the call you get a written price for your project.
Prefer it in writing? Get a written price
Last updated: