Case study · AutomotiveEarlier work by our advisers · client name withheld under NDA
Car body shells on tagged skids in a body shop, with a tagged rack of door panels beside the line
Automotive · DACH · multi-shift

Just-in-sequence traceability that lifted OEE by 9 points.

A German OEM body-shop was losing time to sequence errors and had no audit-grade genealogy for IATF 16949.

The programme and figures on this page come from an earlier work by our advisers. The client name is withheld under NDA. Figures are as reported at the time. Named references are available under NDA when you engage.

Book a free scoping call

The challenge

What they were up against.

Sequence errors caused rework

Mis-sequenced work drove rework and unplanned line stoppages.

No audit-grade genealogy

IATF 16949 traceability could not be reconstructed quickly for audit.

Manual tool control

Torque-tool control was manual and not bound to the vehicle.

Earlier work by our advisers. Client name withheld under NDA. Client name withheld under NDA; figures as reported at the time. Named references available under NDA. We model your own numbers when you engage.

Our approach

Independent, tied to a named KPI.

We combined UWB tool control with Passive RFID just-in-sequence traceability, integrated to Siemens Opcenter MES, binding every torque event to the VIN.

How we solved it

What the engagement delivered.

  • Just-in-sequence WIP traceability at IATF 16949 audit grade
  • UWB-tagged torque tools bound to the VIN
  • Siemens Opcenter MES integration
Results

Results in this engagement

+9 pts
OEE
IATF
16949 audit grade
Fewer
Mis-builds
DACH
Multi-shift
Technology used

The stack behind it

UWBPassive RFIDSiemens Opcenter
How we measured it

Baseline, method, period and what we excluded.

This page describes an engagement our advisers led in earlier roles. The client name is withheld under NDA. Figures are as reported at the time, with published industry sources where noted.

  • Baseline: JIS telegrams trusted; mis-builds found at fit.
  • Method: RFID/RTLS confirmation at dock and lineside supermarket vs MES sequence; mis-build and stoppage counts.
  • Period: Pilot supermarket and two docks, then plant standard.
  • Excluded: MES sequence quality without physical confirmation.

Programme context

JIS programmes verify sequence integrity from supplier through yard to station consume. UHF RFID portals plus selective RTLS on tuggers/AGVs is a common pattern under IATF and OEM CSRs.

Genealogy queries and containment speed are the design north star.

Free download

Planning something similar?

Get the checklists we used on projects like this one. Enter your work email and the files appear right here.

Your download appears on this page as soon as you submit. We keep your email (and name, if given) and the file you requested in HubSpot, our CRM, for up to 24 months so we know what you asked for if you contact us. HubSpot may process data in the EU and the US under Standard Contractual Clauses. We email you only if you tick the box. Privacy Policy.

Outcomes in this engagement and how they were earned

Outcomes: sequence accuracy in the high 90s when process discipline matches technology; faster containment; fewer line stops from wrong-kit.

Lessons from this engagement

Lessons: portal physics in metal yards; MES as SOR; CSR mapping at gate 1; do not skip 2D fallback.

Deeper problem framing

Wrong-sequence kits stop lines. Containment without genealogy freezes excess inventory. CSR pressure exceeds batch-level comfort.

Approach

Portal verification at handoffs; MES SOR; CSR map; 2D fallback; tugger/AGV visibility where yards blur truth.

Outcomes and measurement

Sequence accuracy, stoppage minutes, containment elapsed time.

Governance, risk and what we refuse to claim

Figures from this engagement only. Your payback depends on adoption, integration quality and exception labour, not tag unit cost. Named references under NDA on engagement.

We challenge any supplier who asks you to accept demo-day averages as production truth.

Implementation sequence and change management

Map CSR strictest requirements; instrument supplier-to-station handoffs; MES as SOR; prove containment query in pilot. Include yard metal in RF design.

KPIs: sequence accuracy, line-stop minutes, containment elapsed time. Keep 2D fallback. Challenge 'IATF compliant' logos without genealogy demo on your part numbers.

Buyer checklist, supplier challenges and engagement shape

For JIS, make containment query speed and CSR mapping gate criteria equal to portal read rate.

Buyer checklist before you sign: (1) written system of record for events; (2) acceptance tests with 95th-percentile performance under real interference; (3) integration owner named in IT/OT; (4) privacy or labour consultation path if people are tagged; (5) cybersecurity zoning sketch; (6) five-year TCO including batteries, spares, recalibration and SLA escalations; (7) exit/export terms so you are not hostage to a cloud tenant; (8) a pilot that can fail without political punishment.

Supplier claims to challenge in this pattern: brochure accuracy without production load; 'compliance included' without artefacts; ROI that assumes perfect adoption in 30 days; references that cannot be called under NDA; install partners who have never worked your vertical's overlays; shared support accounts; and any design that dumps locating onto a flat plant or clinical VLAN.

How TRACIO typically engages: stage-1 architecture and measurement design; independent shortlist and RFP language; pilot acceptance criteria; then optional implementation oversight or programme rescue if a prior pilot stalled. We don't sell hardware, so our advice stays independent. Pages like this one exist so you can prepare the workshop. Your numbers replace every planning band when we model payback.

Risk register themes that recur: mute fatigue on alerts; shadow spreadsheets reappearing beside the platform; battery logistics understaffed; master data too weak to support identity; works-council or IG review starting too late; and success declared on demo day before night-shift reality.

Document baseline windows explicitly: what you measured, for how long, which shifts, and what you excluded. Investment committees and auditors both punish fuzzy before/after stories. If your baseline is weak, spend two to four weeks fixing measurement before ordering anchors or portals. That discipline is cheaper than a stranded deployment and is the difference between a locating programme and a technology souvenir.

Could this be your programme?

Tell us where you are stuck.

Thirty minutes on your use case, the numbers, and what would move your KPIs.

Book a free scoping callGet the supplier selection checklistDownload the buyer’s guide

Last updated:

How TRACIO worked the problem

Line-side truth

Independent advisory means the radio is chosen last. After the job, the constraints and the system of record are clear.

JIS / WIP that procurement can audit

Start from the sequence problem and the stations that break first.

Score radios against the plant

Metal, conveyors and existing MES integrations beat brochure accuracy claims.

Feed the systems the plant already runs

Position and identity events into MES/WMS, not a second glass the line ignores.

Measurement

Baseline: sequence integrity, lineside stockouts, and expedite counts on the target line. Pilot: one model/line with identity + location events vs the JIS / sequencing system. Steady-state: sequence error rate, lineside replenishment exceptions, and expedite labour. Figures are as reported in this engagement.